Receiving and ASN: how to control inbound flow
Accurate inventory starts at the dock, not at stocktake. An ASN or other advance notice tells the warehouse what to expect, but it does not replace physical quantity, identity and condition checks.
From advance notice to receipt
In the GS1 Logistics Interoperability Model, an inbound Despatch Notification informs the logistics provider about a dispatched shipment; DESADV is the corresponding GS1 EANCOM message. ASN is often used as the general business term.
The notice should link supplier, order, expected time, packaging and, where used, SSCC. On arrival, the warehouse records actual identity, quantity, condition and destination bin.
A controlled receiving process
The process must separate expected, physically received and available quantity. Stock should not become allocatable merely because the truck arrived.
- Identify the shipment and document; verify supplier and consignee.
- Count and scan items or logistics units.
- Record shortage, overage, damage and unknown item as exceptions.
- Assign status and bin before completing receipt.
Practical example
An ASN states 10 pallets and 1,000 units. Ten arrive, but 20 units are missing and one pallet is damaged. The process should receive 880 good units, quarantine 100 and record a shortage of 20 against the same document.
Common mistakes and measures
Mistakes include receiving into a generic bin without later confirmation, blindly accepting ASN quantities, mixing damaged and available stock, and unclear close rules. Measure dock-to-stock time, discrepancy rate, putaway delay and post-close corrections.
Key terms
- ASN
- Advance notice describing an incoming shipment and its structure.
- DESADV
- The GS1 EANCOM Despatch Advice message.
- Dock-to-stock
- Time from arrival until stock is available for use.